Daftar Dokumen - Tugas Akhir D4
Analisis Kesiapan Alat Rubber Tyred Gantry, Sumber Daya Manusia, Dan Truck Round Time (Receiving) Terhadap Produktivitas Bongkar Muat Di PT Terminal Petikemas Surabaya
Analysis Of Rubber Tyred Gantry Equipment Readiness, Human Resources, And Truck Round Time (Receiving) On Loading And Unloading Productivity At PT Terminal Petikemas Surabaya
Penulis : QUROTU FIRNANDA ATASYA - 21091427067 - Fak. Vokasi

EVALUASI KEBIJAKAN STIKER KELUARGA MISKIN DI KOTA SURABAYA (STUDI PADA KELURAHAN GUNUNG SARI)
AN EVALUATION OF THE POOR HOUSEHOLD STICKER POLICY IN SURABAYA CITY (CASE STUDY IN GUNUNG SARI SUBDISTRICT)
Penulis : NURHAYA FADIAH - 21091377002 - Fak. Vokasi

RANCANG BANGUN SISTEM KEAMANAN PARKIR DAN KENDALI JARAK JAUH PADA SEPEDA MOTOR BERBASIS GPS-GSM PADA TRANSPORTASI KOTA
DESIGN AND DEVELOPMENT OF A GPS-GSM-BASED PARKING SECURITY AND REMOTE CONTROL SYSTEM FOR MOTORCYCLES IN URBAN TRANSPORTATION
Penulis : EDGAR ALANSYAH - 21091427060 - Fak. Vokasi

Analisis Kebutuhan Parkir Dan Solusi Desain Ulang Di Rsud Jombang Untuk Mengatasi Keterbasan Ruang Parkir
Analysis Of Parking Needs And Redesign Solutions At RSUD Jombang To Overcome Parking Space Constraints
Penulis : ARIANSYAH DWIKY KURNIAWAN - 21091427024 - Fak. Vokasi

IMPLEMENTASI METODE DESIGN THINKING PADA SISTEM INFORMASI MANAJEMEN DOKUMEN SURAT BERBASIS WEBSITE (STUDI KASUS : KANTOR KECAMATAN PACE, KABUPATEN NGANJUK)
IMPLEMENTATION OF DESIGN THINKING METHOD ON WEBSITE-BASED LETTER DOCUMENT MANAGEMENT INFORMATION SYSTEM (CASE STUDY: PACE SUBDISTRICT OFFICE, NGANJUK REGENCY)
Penulis : SANTIKA LANA HAYATI - 20051397006 - Fak. Vokasi

ANALISIS KUALITAS STANDAR PELAYANAN (STUDI KASUS : SAHAJA ONLINE (SATU HARI JADI) DINAS KEPENDUDUKAN DAN PENCATATAN SIPIL KABUPATEN KEDIRI)
QUALITY ANALYSIS OF SERVICE STANDARDS (CASE STUDY: ONLINE SAHAJA (ONE DAY FINISHED) POPULATION AND CIVIL REGISTRATION OFFICE OF KEDIRI DISTRICT)
Penulis : NADIVA NUR ANESTA - 20041377029 - Fak. Vokasi

PRODUKTIVITAS TENAGA KERJA PEKERJAAN PELAT LANTAI PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT IBU DAN ANAK NIRMALA KEDIRI 
LABOR PRODUCTIVITY OF FLOOR SLAB WORK ON THE CONSTRUCTION PROJECT OF THE MOTHER AND CHILD HOSPITAL BUILDING NIRMALA KEDIRI 
Penulis : TIARA MAULINDA PUTRI - 19051417053 - Fak. Vokasi

Rancang Bangun Mesin Pencacah Sampah Organik Multifungsi Berkapasitas 54 kg/jam
Design of a Multifunctional Organic Waste Chopping Machine with a Capacity of 54 kg/hour
Penulis : MUCHAMMAD RAFLY SANTOSO - 20051407052 - Fak. Vokasi

PENGEMBANGAN INOVASI LAYANAN COMMUTER PASS TERHADAP TARIF BIAYA TIKET SUROBOYO BUS (Studi Kasus: Trayek Terminal Purabaya – Tanjung Perak)
INNOVATION DEVELOPMENT OF COMMUTER PASS SERVICE ON SUROBOYO BUS TICKET RATES (Case Study:Purabaya Terminal Route – Tanjung Perak)
Penulis : PUTRI AISYAH - 20051427042 - Fak. Vokasi

PEMBUATAN BATIK  NYANGGIT NGGATUK  DENGAN SUMBER IDE BUNGA TIGER LILY  PADA BUSANA ZERO WASTE
MAKING NYANGGIT NGGATUK BATIK USING THE IDEAS OF TIGER LILY FLOWERS IN ZERO WASTE CLOTHING
Penulis : ANDANI WARDA KARINA - 20051447034 - Fak. Vokasi