ANALISA MANAJEMEN LALU LINTAS AKIBAT PEMBANGUNAN APARTEMEN SUNCITY RESIDENCE SIDOARJO
MANAGEMENT ANALYSIS OF THE TRAFFIC IMPACT OF SUNCITY RESIDENCE APARTMENT SIDOARJO CONSTRUCTION
Suncity Residence Apartment Development Plan located on Pahlawan street Sidoarjo will cause a revival that has an impact on the decline in the quality of service at the intersection around the location. The problem needs to be done traffic management due to the construction of Suncity Residence Apartment, in order to minimize the decline in the quality of road network services, and can provide solutions due to problems arising from the construction of the apartment.
The methods used in this final task are based on the Indonesian Road Manual Capacity (MKJI 1997) and regulations relating to traffic impact management. The initial stage of this traffic management is a traffic survey. The next stage calculates the rise and attraction of travel due to development. Analysis of existing conditions is carried out in the next stage, then analyzes traffic conditions during construction and building operation, then conducts traffic forecasting, then compiles internal and external recommendations of the area with the construction of apartments.
The results of the analysis of traffic service levels due to the construction of the apartment are the worst level of service in existing conditions in the unsignaled intersection Thamrin – A. Yani afternoon period with DS 0.899 (LOS E), then during construction and operation unsignaled intersection Thamrin – A. Yani In the morning and evening period has a poor service level with delays of 14.64 and 13.8 smp / second, traffic forecasting in five years operates building poor service levels in signalized intersection Pahlawan – Thamrin afternoon period with DS 1,129 (LOS F) north short and unsignaled intersection at all Period with DS average 1.10 (LOS F). Alternative improvements are geometric widening of roads and signal phase changes, so that the level of service is allowed.